Danville Virginia Homepage
Search
How much do the Permits cost?

BUILDING PERMITS: Fees are based upon the total cost of the improvements to be made, with a minimum fee of $50. The fee for demolishing a structure is $100 and the fee for moving a structure (including a mobile home) is $100. ELECTRICAL PERMITS: Fees are based upon the number and type of outlets to be installed and/or the number and size of main or subpanels, with a minimum of $50. PLUMBING PERMITS: Fees are based upon the number of fixtures or devices to be installed, with a minimum fee of $50. MECHANICAL PERMITS: Fee is based upon the cost of the work to be performed, with a minimum fee of $50. *This fee will also include a 2.00% State Levy.



1.
2.
3.
4.
5.
6.

Contact Us

  1. City of Danville, Virginia
    P.O. Box 3300
    Danville, VA 24543

    Municipal Building:
    427 Patton Street
    Danville, VA 24541

    Staff Directory
  1. All America City Crest for Danville Virginia featuring years 1977, 2020, 2024

  1. Danville Virginia Homepage

Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow